Coal output goes up at coal-mining complex
- Kah Hyun-Jung

- Oct 18
- 1 min read
The Rangrim Area Youth Coal-mining Complex has secured reserve cutting faces through the high-speed tunnelling campaign and introduced advanced coal-mining methods to cut more coal.
The Hangggu Youth Coal Mine has carried out its daily coal production plans more than 1.5 times by conducting a mass movement and doing good deeds for the next shift.
The Rinsan Youth Coal Mine and the Inpho Youth Coal Mine are improving the conditions of cutting faces and increasing the productivity by increasing the operating rate of equipment in cutting faces of all the pits and coal-cutting workteams.
The Phungso Youth Coal Mine is increasing reserve coal deposits by concentrating tunnelling forces and means and ensuring the normal operation of transport equipment to boost the coal output.
The complex is taking foresighted measures for the long-term production.


